Revaluing based on BOM did not include material from underlying subassemblies
When revaluing based on a BOM, the material from underlying subassemblies was not included in the calculation of the material cost.
- Published:30 sep 2026 14:19
- TypeRelease notes
- FunctionalityFIX
- Category
- Product
- Version005.100.004
- AvailabilityOpenbaar