6
Reset filters
:
/
  • 2025-07-06
    MKG5
    MKG3

    A calculation is filled with materials and operations to obtain a well-founded quotation price. This article explains how to add material to your calculation. You can use VRM, the accelerated calculation method.

  • 2026-02-24
    MKG5
    MKG3

    The production order pre-calculation can be manually entered. This is done by adding semi-finished products, materials, and operations for the possible different components. In this article: materials.

  • 2026-02-24
    MKG5
    MKG3

    Currently, twelve standard material formulas are defined in the Material Formulas process table. These can be expanded up to 999 variants.

  • 2026-02-24
    MKG5
    MKG3

    To enable the VRM (accelerated calculation method) functionality, it is necessary to know which specific gravity should be used. The 'Material Types' list meets this need.

  • 2026-02-24
    MKG5

    Within MKG, it is possible to enter a price for each type of material. This material type can be used for VRM materials.

  • 2026-02-24
    MKG5

    Operations group maintenance is intended to group operations. A grouping can, for example, be used in report selections.