Material requirement was reactivated after sub-assembly was reported ready


In a specific situation, the material requirement in a production order was incorrectly reactivated after a sub-assembly was reported as ready via the action list. We have rectified this. This error condition occurred only under the following conditions:

  • Administration Settings > Production Order > PC/AC > Pre-calculation: 'Update PC Number (default value)' = true
  • Administration Settings > Production Order > PC/AC > Pre-calculation: 'Auto-backflush': Never
  • The Update PC Number field is not included in the Report production ready action.