Phase Planning
By default, MKG plans based on operation sequence and structure. It is also possible to plan by phase. This is often used in machine manufacturing. In that case, engineering is performed first, followed by assembly.
|
Attention! |
The figure below provides an example of a (simple) project with lines in the:
- BOM (Bill of Materials)
- Production order
- Calculation
The production phase:
If the order is planned without phase planning, it will appear as follows:
If phase planning is used, the order will appear as follows:
On the 'Operation' tab, the phase can be indicated as follows: