If you place production material in a different order than the original order, you can use 'Go to' from that order line to navigate to the material
If production material is produced with a different production order, you can now navigate from that production order line to the production material to be created from the original production order via Go to
.
- Published:24 aug 2026 15:50
- Latest update:24 aug 2026 15:50
- TypeRelease notes
- FunctionalityVERBETERD
- Category
- Product
- Version005.099.007
- AvailabilityOpenbaar